Description
Earned Value Management (EVM): SPI / CPI / EAC — method, governing standards and output schedule
The Earned Value Management (EVM): SPI / CPI / EAC calculation converts drawing or schedule information into measured quantities, cost or control metrics, reporting the totals with the build-up visible so that each figure can be traced to its source measurement. It is applied during detailed design, during design verification by a second engineer, and again during in-service assessment when the operating basis changes. Because every intermediate quantity is reported rather than only the final answer, the calculation can be checked line by line against the governing standard without re-deriving it.
This 3D-LABS workbook is built to CESMM / IS 1200. You supply 6 inputs and the sheet reports 3 results, with every formula left visible so each figure can be traced to the clause it comes from.
Method of calculation
Quantities are measured item by item from the geometry with the wastage and lap allowances the trade convention requires, and priced against the rate schedule with labour, material, plant and overhead separated. Project control metrics are formed from the earned value relations, where the schedule and cost performance indices are the ratios of earned value to planned value and to actual cost, and the estimate at completion follows from the budget divided by the cost performance index.
Governing standards and references
- PMI PMBOK — Project Management Body of Knowledge
- EIA-748 — Earned Value Management Systems
- PMI Practice Std EVM — Practice Standard for Earned Value Management
- NDIA EVMS — Earned Value Management System Guideline
- DI-MGMT-81861 — Cost/Schedule Performance Report
Each formula cites the clause it comes from on the same row as the result it produces, so a reviewer can check the sheet line by line against the standard.
Acceptance criteria
For the calculation to be reported as acceptable, measured quantities must reconcile with the drawing or model take-off within the agreed tolerance, and cost and schedule indices are assessed against the thresholds set in the project control procedure.
Who uses this calculation
This calculation is used by quantity surveyors and estimators, project control engineers reporting progress, and procurement teams setting inventory and sourcing policy.
What you receive
- Excel calculation file (.xlsx) — fully unlocked formulas and a clear input/output layout
- Worked example — realistic engineering values with expected outputs so you can verify the sheet against a known case
- Code references — every formula cross-referenced to CESMM / IS 1200
- Email support — write to info@3d-labs.com with questions about inputs, methodology or results
Delivery and licence
Instant download after payment at ₹999. One payment, lifetime access, no subscription. The workbook is a design aid — results must be verified by a qualified engineer before use.
What Earned Value Management (EVM): SPI / CPI / EAC — Excel calculates
Earned Value Management (EVM): SPI / CPI / EAC — Excel is an Excel-native engineering calculation tool built by 3D-LABS for engineers, designers, and technical consultants across disciplines. It is used for performing repeatable, verifiable engineering calculations that would otherwise require manual longhand work. Every input is labelled and every output is traceable — the sheet is designed to be checkable, not a black box.
Codes and standards followed
Earned Value Management (EVM): SPI / CPI / EAC — Excel follows industry-standard Engineering codes including PMI PMBOK, EIA-748, PMI Practice Std EVM, NDIA EVMS, DI-MGMT-81861. Each formula is cross-referenced to the applicable code clause so your reviewer can trace calculations back to the standard.
If your project requires a different code base (e.g. converting an IS-code sheet to an ASME basis), we can produce a code-variant edition on request. Contact info@3d-labs.com for a variant quote.
What is included in your download
- The Excel calculation file (.xlsx) — fully unlocked formulas, cell-level comments, and a clear input/output layout.
- A sample worked example — realistic inputs plus expected outputs so you can validate the spreadsheet against a known case.
- User notes (PDF) — assumptions, code clauses referenced, and edge-case guidance.
- Revision history — every update to the spreadsheet is logged so you know what changed and when.
- Email support — reply within 24 hours (Monday to Saturday, IST) for questions about the spreadsheet or its use.
Software requirements
Earned Value Management (EVM): SPI / CPI / EAC — Excel runs in Microsoft Excel 2016 or later on Windows and Mac. It is also compatible with LibreOffice Calc and can be imported into Google Sheets (some formatting may shift). No macros are required and no external add-ins are needed — every calculation runs in cell formulas, which means every step is auditable.
Pricing and delivery
Earned Value Management (EVM): SPI / CPI / EAC — Excel is priced at ₹999 (approximate USD equivalent shown in the cart). Delivery is instant — after payment you get a download link immediately and a receipt by email. One-time purchase, lifetime access, no subscriptions or hidden fees.
Payment methods: Cashfree (Indian customers) or PayPal International (customers outside India). Volume discounts are available on bundles of 5 or more spreadsheets from the same discipline — contact sales@3d-labs.com for a bundle quote.
Related tools and services
Engineers who work with Earned Value Management (EVM): SPI / CPI / EAC — Excel often also need:
- Other Engineering spreadsheets from our catalogue of 900 tools in this discipline.
- Our Engineering Design Services — for projects where the calculation is only part of a larger scope and you want the full engineering deliverable produced by 3D-LABS.
- Our online training courses — instructor-led programmes on Engineering topics, including software mastery and code walkthroughs.
- Our engineering e-book library — 115+ technical PDF references covering theory, practice, and code interpretation.
Why an AI chat answer will not pass design review
A general-purpose AI assistant will answer a question like this in seconds, at no cost. What it will not produce is a calculation you can submit, defend in review, or have sealed. These are the five failure modes that decide whether a number is usable, and what this workbook gives you instead.
1. Calculation errors
Where AI tools fail: Invents or misremembers formulas, slips on unit conversion, and misreads which input is which. It cannot tell you when it has done so.
What this workbook does: Every formula stays visible in the cell, units are fixed in the input table, and a worked example with known values is supplied so you can prove the sheet before you rely on it.
2. Code compliance
Where AI tools fail: Quotes superseded editions, cites the wrong clause, drops required checks, and applies the wrong partial factors or load combinations.
What this workbook does: Built to PMI PMBOK, EIA-748, PMI Practice Std EVM, NDIA EVMS, DI-MGMT-81861. Each reported result carries the clause it comes from on the same row, so a reviewer can check it line by line.
3. Engineering judgement
Where AI tools fail: Misses the governing failure mode, and has no view of boundary conditions, buckling, fatigue, unusual load cases or site constraints it was never told about.
What this workbook does: The acceptance criteria are stated in full, and the method was set by engineers who use it on live projects.
4. Validation and reliability
Where AI tools fail: Returns a different answer on a second attempt, fabricates references and material data, and offers no independent check.
What this workbook does: Deterministic: the same inputs always return the same outputs, and the whole chain can be verified against the governing standard.
5. Accountability and documentation
Where AI tools fail: Leaves no traceability, no stated assumptions and no audit trail, and nobody carries professional responsibility for the result.
What this workbook does: Prints as a complete calculation record showing inputs, assumptions, formulas and references. 3D-LABS can also issue the completed calculation signed and stamped by a chartered engineer.
An AI answer costs nothing and proves nothing. When the calculation has to be submitted, reviewed or sealed, ask 3D-LABS for a signed and stamped calculation.
Frequently asked questions
What software do I need to run Earned Value Management (EVM): SPI / CPI / EAC — Excel?
The spreadsheet is delivered as a native Excel (.xlsx) file. It runs in Microsoft Excel 2016 or later on Windows and Mac. It also runs in LibreOffice Calc and Google Sheets (with import), though some formatting may shift. No macros are required — all logic runs in cell formulas so you can audit every step.
Which codes and standards does this spreadsheet follow?
Earned Value Management (EVM): SPI / CPI / EAC — Excel follows PMI PMBOK, EIA-748, PMI Practice Std EVM, NDIA EVMS, DI-MGMT-81861. Every formula is cross-referenced to the code clause it implements, so your reviewer can trace the calculation back to the standard. If your project needs a different code, contact us — many spreadsheets are available in code-variant editions.
Are the formulas locked or editable?
All formulas are unlocked and editable. You can adapt inputs, add your own load combinations, integrate the sheet into your own workflow, and audit the logic. We do not password-protect our worksheets — an engineer should always be able to verify what the tool is doing.
What is included in the download?
The download includes: (1) the Excel calculation file with all formulas, (2) a sample worked example showing typical inputs and expected outputs, (3) a short user notes PDF explaining assumptions and code clauses used, and (4) a revision history so you can see how the sheet has been updated over time.
Do you offer support if I have questions?
Yes. Email support with any 3D-LABS spreadsheet purchase — reply within 24 hours (Mon-Sat, IST). We also offer paid tuning if you need the spreadsheet adapted to a specific project (typically USD 50-200 depending on scope). Contact info@3d-labs.com for details.
About 3D-LABS engineering spreadsheets
Earned Value Management (EVM): SPI / CPI / EAC — Excel is one of 900 engineering calculation spreadsheets in the 3D-LABS catalogue — the largest curated collection of code-compliant Excel calculators for practising engineers anywhere. Each sheet is built and reviewed by 3D-LABS engineers who use them daily on real client projects across pressure vessel design, storage tank design, piping stress analysis, structural engineering, heat exchanger design, and FEA services since 2003.
Browse the full SpreadSheet Calculations catalogue or the Engineering calculations sub-category. Volume discounts apply on 5+ spreadsheets from the same discipline.
Why buy from 3D-LABS
Built by a working engineering practice
3D-LABS has designed pressure vessels, storage tanks, piping and structures since 2003 for operators and EPC contractors across Asia, the Middle East, Africa and Australia. Our calculation sheets are produced by that same engineering team, to the codes we work to every day.
- 2003Engineering since
- 12Countries delivered into
- 50+Named client organisations
- 14Design codes worked to
Codes our engineers design to
- ASME
- API 650
- API 620
- AWWA D103
- AS 2304
- AS 1210
- TEMA
- PD 5500
- AISC
- IS 800
- EN 1993-4-1
- IBR
- IBC
- BS
Found something that does not work as you expected? Tell us — a working engineer answers, not a support desk.Design and detailing for Larsen & Toubro, Emerson, PetroFac, Qatar Petroleum, ADCO and Samsung Engineering since 2003.