Remove item Product Thumbnail image Price Quantity Subtotal
× Internal Coil Design Calculation — Heat Transfer Excel Internal Coil Design Calculation — Heat Transfer Excel ₹8,000.00
₹8,000.00
× AWWA D103 Bolted Steel Tank Design Calculation — Excel Spreadsheet AWWA D103 Bolted Steel Tank Design Calculation — Excel Spreadsheet ₹26,000.00
₹26,000.00
× API 653 Tank Shell Evaluation Calculation — Excel Sheet API 653 Tank Shell Evaluation Calculation — Excel Sheet ₹799.00
₹799.00
× ACI 318-08 Appendix D Anchoring to Concrete — Excel Calculator ACI 318-08 Appendix D Anchoring to Concrete — Excel Calculator ₹1,299.00
₹1,299.00
× Heating Coil Sizing Calculation (Fuel Oil Tank) — Excel Sheet Heating Coil Sizing Calculation (Fuel Oil Tank) — Excel Sheet ₹8,000.00
₹8,000.00
× Tailing Lug Check with Crane DAF & Pin Hole — Excel Sheet Tailing Lug Check with Crane DAF & Pin Hole — Excel Sheet ₹1,800.00
₹1,800.00

Cart totals

Subtotal ₹45,898.00
Total ₹45,898.00

You may be interested in…