Remove item Product Thumbnail image Price Quantity Subtotal
× Spillway Design: Ogee + Chute + Stilling Basin — Excel Spreadsheet Spillway Design: Ogee + Chute + Stilling Basin — Excel Spreadsheet ₹2,099.00
₹2,099.00
× Bearing Capacity — Terzaghi, Meyerhof & Vesic Excel Calculator Bearing Capacity — Terzaghi, Meyerhof & Vesic Excel Calculator ₹1,999.00
₹1,999.00
× Cathodic Protection Sizing (Sacrificial + Impressed) — Excel Cathodic Protection Sizing (Sacrificial + Impressed) — Excel ₹3,199.00
₹3,199.00
× Pulley / Belt Drive Power & Sizing — Excel Calculator Pulley / Belt Drive Power & Sizing — Excel Calculator ₹1,199.00
₹1,199.00
× Asphalt Mix Design: Marshall Method — Excel Spreadsheet Asphalt Mix Design: Marshall Method — Excel Spreadsheet ₹1,099.00
₹1,099.00
× ASME U-Tube Thickness Design Calculation — Excel Sheet ASME U-Tube Thickness Design Calculation — Excel Sheet ₹3,000.00
₹3,000.00
× Flexible Riser / Umbilical Capacity Check — Excel Calculator Flexible Riser / Umbilical Capacity Check — Excel Calculator ₹2,099.00
₹2,099.00
× Storage Tank Internal Coil Design — Excel Spreadsheet Storage Tank Internal Coil Design — Excel Spreadsheet ₹8,000.00
₹8,000.00
× Anchor Cross-Section Calculation — Structural Excel Sheet Anchor Cross-Section Calculation — Structural Excel Sheet ₹600.00
₹600.00
× Buried Pipe Soil Loads (Marston-Spangler) — Excel Buried Pipe Soil Loads (Marston-Spangler) — Excel ₹999.00
₹999.00
× Slug Force Design — Piping Excel Spreadsheet Slug Force Design — Piping Excel Spreadsheet ₹4,000.00
₹4,000.00
× Stilling Basin: Type I/II/III/IV USBR — Excel Stilling Basin: Type I/II/III/IV USBR — Excel ₹999.00
₹999.00
× API 653 Tank Shell Evaluation Calculation — Excel Sheet API 653 Tank Shell Evaluation Calculation — Excel Sheet ₹799.00
₹799.00
× Heat Treatment: Quench Severity (Grossmann H-value) — Excel Heat Treatment: Quench Severity (Grossmann H-value) — Excel ₹999.00
₹999.00
× Brake System Sizing (Hydraulic + Mechanical) — Excel Calculator Brake System Sizing (Hydraulic + Mechanical) — Excel Calculator ₹1,299.00
₹1,299.00
× ASME Nozzle Reinforcement Design — Excel Spreadsheet ASME Nozzle Reinforcement Design — Excel Spreadsheet ₹4,000.00
₹4,000.00
× Conductor / Caisson Design (Bending + Lateral Soil) — Excel Conductor / Caisson Design (Bending + Lateral Soil) — Excel ₹2,199.00
₹2,199.00
× Heating Coil Sizing Calculation — Excel Sheet Heating Coil Sizing Calculation — Excel Sheet ₹8,000.00
₹16,000.00
× Cofferdam Design (Sheet Pile + Cellular) — Excel Spreadsheet Cofferdam Design (Sheet Pile + Cellular) — Excel Spreadsheet ₹1,699.00
₹1,699.00
× Agitator / Impeller Power & Torque — Excel Agitator / Impeller Power & Torque — Excel ₹2,199.00
₹2,199.00
× ABC Inventory Classification + Pareto — Excel ABC Inventory Classification + Pareto — Excel ₹1,199.00
₹1,199.00
× Building Energy Modelling: Quick LEED Energy — Excel Building Energy Modelling: Quick LEED Energy — Excel ₹1,699.00
₹1,699.00
× Earth Dam: Stability + Seepage Analysis — Excel Spreadsheet Earth Dam: Stability + Seepage Analysis — Excel Spreadsheet ₹2,099.00
₹2,099.00
× Arch Dam: Trial-Load + Membrane Analysis — Excel Spreadsheet Arch Dam: Trial-Load + Membrane Analysis — Excel Spreadsheet ₹3,499.00
₹3,499.00
× Tailing Lug Check with Crane DAF & Pin Hole — Excel Sheet Tailing Lug Check with Crane DAF & Pin Hole — Excel Sheet ₹1,800.00
₹1,800.00
× Partition Plate Calculation — Excel Sheet Partition Plate Calculation — Excel Sheet ₹6,000.00
₹6,000.00
× Bridge Foundation — Well Foundation Design - Excel Spreadsheet | 3D-LABS Bridge Foundation: Well Foundation Design — Excel Spreadsheet ₹1,699.00
₹1,699.00

Cart totals

Subtotal ₹76,481.00
Total ₹76,481.00

You may be interested in…