|
× |
|
Spillway Design: Ogee + Chute + Stilling Basin — Excel Spreadsheet |
₹2,099.00 |
|
₹2,099.00 |
|
× |
|
Bearing Capacity — Terzaghi, Meyerhof & Vesic Excel Calculator |
₹1,999.00 |
|
₹1,999.00 |
|
× |
|
Cathodic Protection Sizing (Sacrificial + Impressed) — Excel |
₹3,199.00 |
|
₹3,199.00 |
|
× |
|
Pulley / Belt Drive Power & Sizing — Excel Calculator |
₹1,199.00 |
|
₹1,199.00 |
|
× |
|
Asphalt Mix Design: Marshall Method — Excel Spreadsheet |
₹1,099.00 |
|
₹1,099.00 |
|
× |
|
ASME U-Tube Thickness Design Calculation — Excel Sheet |
₹3,000.00 |
|
₹3,000.00 |
|
× |
|
Flexible Riser / Umbilical Capacity Check — Excel Calculator |
₹2,099.00 |
|
₹2,099.00 |
|
× |
|
Storage Tank Internal Coil Design — Excel Spreadsheet |
₹8,000.00 |
|
₹8,000.00 |
|
× |
|
Anchor Cross-Section Calculation — Structural Excel Sheet |
₹600.00 |
|
₹600.00 |
|
× |
|
Buried Pipe Soil Loads (Marston-Spangler) — Excel |
₹999.00 |
|
₹999.00 |
|
× |
|
Slug Force Design — Piping Excel Spreadsheet |
₹4,000.00 |
|
₹4,000.00 |
|
× |
|
Stilling Basin: Type I/II/III/IV USBR — Excel |
₹999.00 |
|
₹999.00 |
|
× |
|
API 653 Tank Shell Evaluation Calculation — Excel Sheet |
₹799.00 |
|
₹799.00 |
|
× |
|
Heat Treatment: Quench Severity (Grossmann H-value) — Excel |
₹999.00 |
|
₹999.00 |
|
× |
|
Brake System Sizing (Hydraulic + Mechanical) — Excel Calculator |
₹1,299.00 |
|
₹1,299.00 |
|
× |
|
ASME Nozzle Reinforcement Design — Excel Spreadsheet |
₹4,000.00 |
|
₹4,000.00 |
|
|