Remove item Product Thumbnail image Price Quantity Subtotal
× Davit Design Calculation — Structural Excel Sheet Davit Design Calculation — Structural Excel Sheet ₹1,500.00
₹1,500.00
× API 653 Tank Shell Evaluation Calculation — Excel Sheet API 653 Tank Shell Evaluation Calculation — Excel Sheet ₹799.00
₹2,397.00
× Partition Plate Calculation — Excel Sheet Partition Plate Calculation — Excel Sheet ₹6,000.00
₹24,000.00
× ASME B31.8 Pipe Wall Thickness — Gas Transmission Excel ASME B31.8 Pipe Wall Thickness — Gas Transmission Excel ₹8,000.00
₹8,000.00
× Transport Saddle Design Calculation — Excel Sheet Transport Saddle Design Calculation — Excel Sheet ₹8,000.00
₹8,000.00
× Internal Coil Design Calculation — Heat Transfer Excel Internal Coil Design Calculation — Heat Transfer Excel ₹8,000.00
₹16,000.00
× Anchor Cross-Section Calculation — Structural Excel Sheet Anchor Cross-Section Calculation — Structural Excel Sheet ₹600.00
₹1,200.00
× Pipe Wall Thickness Design — Excel Spreadsheet Pipe Wall Thickness Design — Excel Spreadsheet ₹6,000.00
₹6,000.00
× Heating coil sizing calculation - Excel Spreadsheet | 3D-LABS Fuel Oil Tank Heating Coil Sizing Calculation — Excel Sheet ₹8,000.00
₹8,000.00
× IGEM TD13 Pipe Wall Thickness Design — Excel Sheet IGEM TD13 Pipe Wall Thickness Design — Excel Sheet ₹8,000.00
₹8,000.00
× Spreader Beam Design — Lifting Excel Spreadsheet Spreader Beam Design — Lifting Excel Spreadsheet ₹9,000.00
₹9,000.00

Cart totals

Subtotal ₹92,097.00
Total ₹92,097.00

You may be interested in…